General NPDES Permit: Discharge of Stormwater and Hydrostatic Test Water from Oil Terminals - OGT
Select Permit Type:
Select Action Type:
General NPDES Permit: Discharge of Stormwater and Hydrostatic Test Water from Oil Terminals - OGT
This general permit covers the following discharges to surface water or groundwater of the State: 1. All new and existing discharges of stormwater from storage tank dikes (i.e. secondary containment dikes) and loading rack areas and 2. All new and existing discharges of hydrostatic test water from oil terminals.
- Expected Fee
- $120
- Duration
- 12 Months
Obtaining the permit
- Step 1:
- Submit complete General NPDES Permit Form for Discharge of Treated Storm Water
Want to apply for the permit?.
Apply NowWant to learn more about the permit?
Contact Details
General NPDES Permit: Discharge of Stormwater and Hydrostatic Test Water from Oil Terminals - OGT
This general permit covers the following discharges to surface water or groundwater of the State: 1. All new and existing discharges of stormwater from storage tank dikes (i.e. secondary containment dikes) and loading rack areas and 2. All new and existing discharges of hydrostatic test water from oil terminals.
- Expected Fee
- $120
- Duration
- 12 Months
Obtaining the permit
- Step 1:
- Submit complete General NPDES Permit Form for Discharge of Treated Storm Water